The article reveals the Indian Point Disaster's arounding situation which is without any specific nuclear emergency plant. It descripes the different views of communities and shows the area in 5 miles radius to contrast the public emergency response should be urged and expanded. The lack of nuclear emergency response and resisdents education are should be improved by government.  

pece_annotation_1473037830

a_chen

Due to the mass destruction of the area, the first few days’ data were not able to collect (not  only the destruction, but the rescue was the first priority). Therefore, the scientific committee  used models to simulate and analyse the data (might not be accurate on the early stage). After  the rescue, many countries have provided data to assist the works. For the long‐live radioactive  substances, the data was able to collect with the ground soils. Furthermore, prediction can be  made with the pass experiences and the basic models.

pece_annotation_1473630164

a_chen
Annotation of
In response to

The received data can be managed and visualised into charts or map tiles (e.g. open street maps or satellite maps). The data is visualized in the panel of “Visualize Your Story “with four modes of visual features.

  • Branded Deployment
  • Map Mode
  • Timeline Mode
  • Activity Analytics Mode

pece_annotation_1474248154

xiaox
Annotation of

Live Box is designed for disaster zone after the natural disaster. Particularlly the area that relief providers can not arrive immediately. Live Box offers three usage types for different needs which are "air", "land" and " water". For example, the "air" type could be sent by aircraft to the area if the roads are blocked after earthquake. The "water" type could be used for flood-affected areas and it could be used as a shelter on water and land. Similarly, the "land" type could be used as temporary hospital or emergency centre. 

pece_annotation_1474297589

a_chen
Annotation of

Since the article reported that this is the fourth edition of the design, most of the problems are solved during the refurbishment of product. So there are not many problems with the design as they tested with the publics. But they plan to make the bridge “stronger, longer, lighter, more compact and quicker to set up”.